Sept-Îles Detention Facility

Client: Société québécoise des infrastructures (SQI)

Project description

Construction of a new detention facility that includes a gymnasium, changing rooms, store, storage rooms, medical centre, kitchen, dining room, emergency vehicle parking area, workshops, social spaces, prison guard station, laundry room, secure server rooms and 55 cells (mechanical-electrical work carried out as part of a joint venture).

  • Area: 7,015 M²
  • Integrated design process (IDP)
  • LEED-certified project
  • Highly stringent security measures
  • Specific vandalism-resistant equipment
  • Electrical design completely eliminates reduced lighting areas
  • Designed to limit contact between staff and inmates when using the facility
  • All-weather power supply, supported by three generators
  • Sustainability and energy efficiency considerations (heat recovery on nearly all ventilation systems, variable flow operations, optimized DDC controls, carbon dioxide controls etc.)

Expertise

Location

Sept-Îles, QC

Inspired by
Our Approach?

Scroll to Top