Jonquière Vocational Training Centre

Client: Jonquière School Board

Project description

Construction of a two-storey expansion to accommodate six multipurpose workshops, as well as the redevelopment of existing spaces.

  • Phased implementation.
  • A basic concept redesigned according to the existing structure.
  • Seven new ventilation systems with heat recovery and a dust collection system.
  • Ventilation adapted to the current and future workshop needs, optimizing the building’s energy consumption.
  • A new hydraulic lifting system for materials handling on the first floor and two hydraulic container lifting systems.
  • Construction of a second pitched roof over the existing one to limit snow loads.
  • New water main by drilling a kilometre-long length through a six-lane boulevard.
  • Area: 4,411 M²