RBC Centre

Client: Halifax Regional Municipality

Project description

This state-of-art facility of 175,000 sq. ft. consists of 3 NHL sized ice pads and 1 Olympic sized ice pad, dressing rooms (team rooms, main viewing corridor, office/reception areas, concession and sports retail; multi-purpose room, boardroom, and washrooms.

M&R Engineering (a member of BPA) was responsible for mechanical design including HVAC and Plumbing.

  • Heating system utilizes 95°F/35°C waste heat from the ice plant providing all of the building’s heating except for the coldest days.
  • Service hot water for ice making and domestic hot water are preheated by waste heat from the ice plant.
  • Gas fired boilers provide supplemental space, service water and domestic water heating.
  • Heat recovery ventilators provide fresh air to the dressing rooms and air handling units.
  • Embedded bleacher radiant heating provides a more comfortable environment and saves energy compared to conventional heating systems.
  • Variable Speed drives are installed on circulation pumps to save electricity and provide greater control.
  • LEED Canada-NC Silver

Expertise

Location

Dartmouth, NS

Inspired by
Our Approach?

Scroll to Top