AXE Medical Complex – Parking
Client: Trimco & JE Perron
Project presentation
The project includes a new paved parking lot for the AXE medical complex. An application for a certificate of authorization was made for the entire site in order to install a piping network with retention basins and a hydrodynamic separator.
-
Characteristics and Impacts
- Installation of a system to separate suspended solids in the stormwater network.
- Installation of stormwater retention basins to reduce discharge rates and erosion into watercourses.