Centre Bell

AMPHITHEATER
Category
Culture, Sports and Tourism

Amphitheater, museum, restaurants, indoor parking (650 seats), bus terminal, concessions

 

Type of project

New construction

 

Scope

90,000 m² | 22 000 seats

 

Construction cost

$175M

 

Highlights
  • Flexible and adaptable systems for optimal performance during various different events
  • Construction was completed in sections
  • Energy systems designed at the cutting edge of technology
  • Mechanical and electrical systems ensure security in case of fire
  • Initial design completed in 7 months while respecting the tight budget
  • 350 mechanical and electrical systems interconnected and controlled by computer
  • High capacity generators to avoid system failures during events